Rivet machine safety specification operation (2)

Update:05-08-2019
Summary:

Operation method: 1. The power switch is placed in the […]

Operation method:
1. The power switch is placed in the "ON" position, at which point the motor and flywheel are running.
2. Place the desired riveted material in the floating position of the mandrel. After the hole is aligned, place the material to be riveted.
3. Step on the pedal, unscrew the clutch, make the upper die go from the top dead center to the bottom dead point, rive the rivet into the hole fixed by the material, and then return to the original top dead center, and complete the cycle.

www.steady-ind.com